Showing posts with label The way we do things. Show all posts
Showing posts with label The way we do things. Show all posts

Friday, August 6, 2010

Another Old Building Bites the Dust




I went to a design meeting this morning, with a developer who wants to knock a building down next to the track and built another glass fortress. It will go up 38 feet and then cantilever over the track. The other photo is of a track grinder that will start on Sunday morning profiling our track. This should have been done three years ago at about 1/3 the cost. The track and the tires of the trains are cut to minimize the drag, for the most efficient operation.